Rank: Elder Joined: 5/25/2012 Posts: 4,105 Location: 08c
|
Quote:Key operational results include:
• Enhanced customer experience as the reliability of power supply has continued to improve. Over 184,000 customers are now on prepayment meters, representing 28% of the customer base and all new connections use the prepaid system.
• Energy losses reduced to 21.3% in 2014 compared to 24.3% achieved in 2013
• A revenue collection rate of 99.1% was achieved in the year
• The customer base increased by an additional 76,000 connections, representing 13% year on year growth
• Significant projects completed in the year include Queensway 2 and Nagongera substations, technical loss reduction on Kampala North-Gayaza and Kawempe, Bombo-Luwero, Bombo-Namulonge feeders and network refurbishment in Mbarara Central-Masaka West and Hoima-Busunju. Pesa Nane plans to be shilingi when he grows up.
|