The great thing is that on
NTV last nite, the reporter confirmed the NLM story point by point.
• Green Energy Group was formed in 2008 and has little experience in these sort of projects
• After getting the 1st bit of business in supplying a miniature geothermal power generator (it sent a propoasal to KenGen, which KenGen accepted), it outsourced the same to Hinduja (Kamani) connection.
• In keeping with the Mahindra-quality, the mini-plant provided has not worked despite Hindujan sending some chutes to re-install it. Eddie, said they had now ordered another generator.
• In the meantime, Green Energy has been given a bigger Ksh9bn contract to provide bigger geothermal generators. Again with no bidding.
None of the above was disputed by Eddie or Titus Mbathi