Construction cost estimates done by professionals appear high to the layman when compared to cost estimates done by local fundis for the same.
The reason this happens is because the local fundis do not categorise the construction cost in terms of low, middle or high cost materials.
They also do not include all the details and accessories that come with the main product.
These details tend to be easily overlooked form a layman point of view in estimating the total cost of construction.

EXAMPLE: ESTIMATING COST OF A DOOR.

A flush door costs approximately KES 2,000 in any given hardware shop in Kenya. When estimating the cost of a door, the fundi will advice the house owner that the doors will cost him/her KES 2,000. The house owner will then budget the cost as KES 2,000 multiplied by the number of doors in the house.

PROFESSIONAL ADVICE.

A professional will advice the house owner that the flush door costs KES 2,000. Also, the flush door comes with a door lock costing KES 1,500 which can be 2 or 3 lever depending on the security level required. In addition to the door and door lock, there will be the cost of door hinges which costs approximately KES 200. A door stopper costing KES 200 will also be required. The door will also require a door frame costing KES 1,500 depending on the design ,wood type and thickness of the door frame required. This door will also require an additional 10% to 20% of the cost as labour plus transport costs.
The same door that a fundi advises the house owner to cost KES 2,000 will now be estimated by the professional to cost KES 6,000.
This is the least it would cost to fix the door. The Fundi gives the cost of a door at the hardware shop while the professional gives the cost of a door from purchasing it from the shop until fixing it in the house.

VARIANCE.

This variance of over 200% in cost estimate is what the fundi fails to advice the house owner. The consequences are as follows;
1. If the money the house owner is using to construct was borrowed from a bank, the house will not be complete due to cost overruns.
2. The house owner would have liked to know the possible options for materials in term of costs available in the market so that they can make an informed decision.
3. In severe cases, total building construction quality is compromised due to poor planning hence building collapse.

REASONS WHY THE COST ESTIMATES VARY.

The reason why the cost estimates vary so much is because of the fundis are generally well-versed with the actual construction techniques as opposed to cost estimation.
read more here
http://www.a4architect.c...ofessionals-appear-high/
As Iron Sharpens Iron, So one Man Sharpens Another.
GGK
#2 Posted : Tuesday, January 03, 2012 8:59:19 AM
Rank: Member

Joined: 11/21/2006
Posts: 608
Location: Ruiru
Good piece.
The door example is on the spot. I went to Gikomba the other day to look for doors. The sellers reminded me of the hinges and locks.

Yes, the artisans lack that holistic view of project and may not be the best source of info
"..I am because we are. "― Ubuntu, Umtu,
a4architect.com
#3 Posted : Tuesday, January 03, 2012 9:11:40 AM
Rank: Veteran

Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@GGK. ..and the door frame. The frame and door lock costs nearly as much as the door itself.
As Iron Sharpens Iron, So one Man Sharpens Another.
majimaji
#4 Posted : Tuesday, January 03, 2012 10:34:39 AM
Rank: Veteran

Joined: 4/4/2007
Posts: 1,162

Remember to paint the door. Add that cost too.
a4architect.com
#5 Posted : Tuesday, January 03, 2012 10:41:57 AM
Rank: Veteran

Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@majimaji..thoughtful addition ..there is painting the door and door frame. There are a few nails for the door frame, polyfilla for the door frame joints.
As Iron Sharpens Iron, So one Man Sharpens Another.
mwenza
#6 Posted : Tuesday, January 03, 2012 1:35:00 PM
Rank: Elder

Joined: 4/22/2009
Posts: 2,863
a4architect.com wrote:
@majimaji..thoughtful addition ..there is painting the door and door frame. There are a few nails for the door frame, polyfilla for the door frame joints.



Add the the cost of
...wall fasts
...Archtraves and/or quadrants.
IF YOU EXPECT ME TO POST ANYTHING POSITIVE ABOUT ASENO, YOU MAY AS WELL SIT ON A PIN
a4architect.com
#7 Posted : Tuesday, January 03, 2012 1:48:50 PM
Rank: Veteran

Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@mewnza...good addition.wall fasts are mandatory-there are no shortcuts or other options for this.
As Iron Sharpens Iron, So one Man Sharpens Another.
earthvoice
#8 Posted : Tuesday, January 03, 2012 1:58:30 PM
Rank: Member

Joined: 1/29/2011
Posts: 257
This thread reminds us all of the real worth of Wazua!
Applause Applause Applause Applause Applause Applause
"All intelligent investing is value investing -- acquiring more than you are paying for. You must value the business in order to value the stock." - Charlie Munger.
a4architect.com
#9 Posted : Tuesday, January 03, 2012 2:02:53 PM
Rank: Veteran

Joined: 1/4/2010
Posts: 1,668
Location: nairobi
@earchvoice..true. Information shared makes us all wiser.
As Iron Sharpens Iron, So one Man Sharpens Another.
TiggerTiggy
#10 Posted : Tuesday, January 03, 2012 2:14:19 PM
Rank: Veteran

Joined: 10/13/2011
Posts: 660
good article. i think another reason why estimates from professionals are high is so the professionals can 'eat' especially when supplying materials. kweli ama rongo?
2 Pages12>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2026 Wazua.co.ke. All Rights Reserved.