Visited Two Rivers (on a Saturday in June 2021) as part of my ongoing DD.
The MallQuite busy (lots of young people) but that doesn't always translate into sales for shops. There was an event going on which seemed to attract a lot of young people.
Carrefour was busy and the floor was teeming with people/shoppers.
The food court was quite busy.
The ground floor (CK Square/waterfront) had a lot of activity. Some musical group was playing. Probably related to the event going on.
The upper floors were NOT busy and one could have driven a car though it without any drama! Lots of empty storefronts. I wonder how busy it is during weekdays. It would not surprise me if some of the banks left ATMs in place but didn't have banking halls.
ResidentialCascadia is coming together. You can see the construction from Limuru Rd and from the mall. Multiple blocks coming up but delivery . They are marketed as located in Gigiri. Delivery of the first block, IMHO, is FY23.
One tower of Riverbank looks almost done but finishing can take longer. Good to see a local (not Chinese) contractor on site. I doubt the 2nd tower will start any time soon unless the economy picks up and global travel re-starts. I can see they will be attractive for UN and embassy personnel. Delivery, IMHO, is 2H22.
Mzizi has been sectioned off but the ground has not broken yet BUT IMHO sales are probably good. Centum has been pushing these to bulk buyers as an alternate to Ruaka. Delivery of Phase 1 is FY2025. Patience required.
I couldn't figure out where the 35mn+ "The Loft" houses (not high-rises) were but some have broken ground. Those will be a tough sell for the remainder.
Centum said in earlier presentations that they break ground (for a building) once they get 30% sales. Seems they have managed that for all 4 projects in Two Rivers. The nature of the buildings means they will have some empty units upon completion but they can rent these out.
Vipingo
Awali has been handed over (in 2H 2020-21) so we should see the "profits" (not cashflow) coming through. It seems they have a few units that haven't sold or repossessed after the buyers fell through.
No signs of Phase 2 yet but perhaps they haven't reached 30% sales yet.
1255 Palm Phase 2 has started. Phase 1 is almost complete and will be delivered in in 3-6 months in FY22.
Kingswood plots being sold at 2.5mn+ each.
Also 20mn+ plots near the ocean/cliff. These may take a while though! Pole pole is OK given there are a lot of plots to be sold. These will compete with Vipingo Ridge.
Uganda Pearl Marina That's a trip I would love to take!
Greedy when others are fearful. Very fearful when others are greedy - to paraphrase Warren Buffett