Wazua
»
Investor
»
Property
»
Building an apartment complex. Too good to be true?
Rank: Elder Joined: 6/2/2011 Posts: 4,824 Location: -1.2107, 36.8831
|
ngapat wrote:I got a quotation of ksh 1,150,000 for a two bedroom residential house master ensuite (not storey). Feel like its on the higher side.
Plus whats the approximate cost to build a perimeter wall for a 100 by 100 ft plot
From basic principals again;
A. EXCAVATION FOR FOUNDATION (They come with tools)
A.1 - Fundi (1 day @ 1,200/-) = 1,200/-
A.2 - Watu wa mkono (3 guys @ 500/-) = 1,500/-
B. FOUNDATION (strip footing and foundation wall)
B.1 - Fundi (3 days @1,200/-) = 3,600/-
B.2 - Watu wa Mkono (3 guys, 3 days @500/-) = 4,500/-
B.3 - Foundation Stones (1,200ft @ 27/-) = 32,400/-
B.4 - Cement (50 bags @ 600/-) = 30,000/-
B.5 - River Sand (6 Tons @2,200/-) = 13,200/-
B.6 - Gravel (6 Tons @ 2,200/-) = 13,200/-
B.7 - Water (2,000 liters) = 2,000/-
B.8 - Transportation of materials = 10,000/-
C. SUPER-STRUCTURE WALL (Keyed only on one wall)
C.1 - Fundi (21 days @1,200/-) = 25,200/-
C.2 - Watu wa Mkono (6 guys, 21 days @500/-) = 63,000/-
C.3 - Ndarugu 6" Stones (4,400 pieces @ 20/-) = 88,000/-
C.4 - Cement (50 bags @ 600/-) = 30,000/-
C.5 - River Sand (11 Tons @2,200/-) = 24,200/-
C.6 - Water (3,000 liters) = 3,000/-
C.7 - Transportation of materials = 20,000/-
TOTAL ESTIMATED COST = KSHS. 365,000 Receive with simplicity everything that happens to you.” ― Rashi
|
|
|
Rank: Member Joined: 5/15/2019 Posts: 687 Location: planet earth
|
dunkang wrote:ngapat wrote:I got a quotation of ksh 1,150,000 for a two bedroom residential house master ensuite (not storey). Feel like its on the higher side.
Plus whats the approximate cost to build a perimeter wall for a 100 by 100 ft plot
From basic principals again;
A. EXCAVATION FOR FOUNDATION (They come with tools)
A.1 - Fundi (1 day @ 1,200/-) = 1,200/-
A.2 - Watu wa mkono (3 guys @ 500/-) = 1,500/-
B. FOUNDATION (strip footing and foundation wall)
B.1 - Fundi (3 days @1,200/-) = 3,600/-
B.2 - Watu wa Mkono (3 guys, 3 days @500/-) = 4,500/-
B.3 - Foundation Stones (1,200ft @ 27/-) = 32,400/-
B.4 - Cement (50 bags @ 600/-) = 30,000/-
B.5 - River Sand (6 Tons @2,200/-) = 13,200/-
B.6 - Gravel (6 Tons @ 2,200/-) = 13,200/-
B.7 - Water (2,000 liters) = 2,000/-
B.8 - Transportation of materials = 10,000/-
C. SUPER-STRUCTURE WALL (Keyed only on one wall)
C. 1 - Fundi (21 days @1,200/-) = 25,200/-
C.2 - Watu wa Mkono (6 guys, 21 days @500/-) = 63,000/-
C.3 - Ndarugu 6" Stones (4,400 pieces @ 20/-) = 88,000/-
C.4 - Cement (50 bags @ 600/-) = 30,000/-
C.5 - River Sand (11 Tons @2,200/-) = 24,200/-
C.6 - Water (3,000 liters) = 3,000/-
C.7 - Transportation of materials = 20,000/-
TOTAL ESTIMATED COST = KSHS. 365,000
Are you a slave driver? 
Jameni please pay your workers a living wage
What can soo tano buy these days?
Imagine a mtu wa mkono with hungry wife and 5 kids waiting nyumbani for him. Not only must he bring home unga na sukuma na madondo (meat being a luxury) but must also jipanga for their school fees, stima or makaa, rent, na kadharika with his daily wage.
Jameni how will he survive on soo tano crumbs?
In the final analysis, it all boils down to sheer plain old hard work and dogged persistence. Nothing more, nothing less!!
|
|
|
Wazua
»
Investor
»
Property
»
Building an apartment complex. Too good to be true?
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|