KenGen HY 2019
Rank: Member Joined: 11/17/2018 Posts: 173 Location: Mars
|
|
|
|
Rank: Veteran Joined: 4/30/2010 Posts: 1,635
|
|
|
|
Rank: Member Joined: 11/17/2018 Posts: 173 Location: Mars
|
FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Hydro is not particularly renowned for its profitability...
|
|
|
Rank: Member Joined: 8/6/2018 Posts: 299
|
FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Even this December ,Lake Turkana Wind will be curtailed(it has reached its annual threshold) so KenGen Hydros and Geothermals will run full capacity untill year end.
|
|
|
Rank: Member Joined: 11/17/2018 Posts: 173 Location: Mars
|
KaunganaDoDo wrote:FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Even this December ,Lake Turkana Wind will be curtailed(it has reached its annual threshold) so KenGen Hydros and Geothermals will run full capacity untill year end. But why would it be curtailed if the electricity is half price on threshold being exceeded?
|
|
|
Rank: Member Joined: 8/6/2018 Posts: 299
|
Extraterrestrial wrote:KaunganaDoDo wrote:FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Even this December ,Lake Turkana Wind will be curtailed(it has reached its annual threshold) so KenGen Hydros and Geothermals will run full capacity untill year end. But why would it be curtailed if the electricity is half price on threshold being exceeded? The reason why Lake Turkana Wind was given prominence in dispatch is because they have deemed generation contract...KPLC has to dispatch them upto the threhhold or pay them.....after the threshold is reached per year, no firm obligation to pay them...What has been happening is that KenGen plants(hydros and geothermal) have been curtailed to favour LTWP dispatch....despite a marginal costs of Geothermals and hydros being almost 2.5 shillings per kWh...LTWP is tariff is 11 shillings per kWh....even if the tariff is half for LTWP, its still expensive than KenGen Geothermals and Hydros....Olkaria IV and Olkaria I has been venting steam TREASURY PAYS ltwp Ksh 1.2B CHINI YA MAJI
|
|
|
Rank: Chief Joined: 1/3/2007 Posts: 18,366 Location: Nairobi
|
KaunganaDoDo wrote:Extraterrestrial wrote:KaunganaDoDo wrote:FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Even this December ,Lake Turkana Wind will be curtailed(it has reached its annual threshold) so KenGen Hydros and Geothermals will run full capacity untill year end. But why would it be curtailed if the electricity is half price on threshold being exceeded? The reason why Lake Turkana Wind was given prominence in dispatch is because they have deemed generation contract...KPLC has to dispatch them upto the threhhold or pay them.....after the threshold is reached per year, no firm obligation to pay them...What has been happening is that KenGen plants(hydros and geothermal) have been curtailed to favour LTWP dispatch....despite a marginal costs of Geothermals and hydros being almost 2.5 shillings per kWh...LTWP is tariff is 11 shillings per kWh....even if the tariff is half for LTWP, its still expensive than KenGen Geothermals and Hydros....Olkaria IV and Olkaria I has been venting steam That grand Jubilee plans and tall tales of industrialization in 5-10 years have fallen flat. Greedy when others are fearful. Very fearful when others are greedy - to paraphrase Warren Buffett
|
|
|
Rank: Member Joined: 8/6/2018 Posts: 299
|
VituVingiSana wrote:KaunganaDoDo wrote:Extraterrestrial wrote:KaunganaDoDo wrote:FUNKY wrote:https://www.businessdailyafrica.com/economy/cheaper-power-for-Kenyans/3946234-5369406-8h4otb/index.html
Next year is gonna be very good for kengen Even this December ,Lake Turkana Wind will be curtailed(it has reached its annual threshold) so KenGen Hydros and Geothermals will run full capacity untill year end. But why would it be curtailed if the electricity is half price on threshold being exceeded? The reason why Lake Turkana Wind was given prominence in dispatch is because they have deemed generation contract...KPLC has to dispatch them upto the threhhold or pay them.....after the threshold is reached per year, no firm obligation to pay them...What has been happening is that KenGen plants(hydros and geothermal) have been curtailed to favour LTWP dispatch....despite a marginal costs of Geothermals and hydros being almost 2.5 shillings per kWh...LTWP is tariff is 11 shillings per kWh....even if the tariff is half for LTWP, its still expensive than KenGen Geothermals and Hydros....Olkaria IV and Olkaria I has been venting steam That grand Jubilee plans and tall tales of industrialization in 5-10 years have fallen flat. Flat. By the way they have really messed up the energy sector with numerous supply side costs that's even remotely impossible to reduce cost of electricity by even a cent/kwh in the coming 5 years
|
|
|
Rank: Member Joined: 8/6/2018 Posts: 299
|
|
|
|
Rank: Veteran Joined: 4/30/2010 Posts: 1,635
|
|
|
|
Wazua
»
Investor
»
Stocks
»
KenGen HY 2019
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.