KenGen HY 2019
sparkly
#101 Posted : Wednesday, July 03, 2019 12:01:19 PM
Rank: Elder


Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
KaunganaDoDo wrote:
[quote=Ericsson]Kengen to sell power from Olkaria to South Sudan

http://www.xinhuanet.com...9-07/02/c_138193143.htm[/quote]

More Porojoooo....KenGen has contracted all of its installed Generation Capacity to KPLC...it doesn't have any spare to sell to other Party without Breaking POwer Purchase Agreements with KPLC. Even the oncoming Olkaria V and Olkaria 1 Unit VI is all contracted.

The only entity that can sell power to SSudan in KPLC, since its the owner of the excess contracted Capacity. Just like Kenya Buys power from Uganda...Kplc doesn't buy it from The Generator..UEGCL, it buys from UETCL...Uganda Electricity Transmission Company Limited.



All it takes for Kengen to sell power directly to SS is amendment of one or two sections of the Energy Act.
Life is short. Live passionately.
KaunganaDoDo
#102 Posted : Wednesday, July 03, 2019 1:46:55 PM
Rank: Member


Joined: 8/6/2018
Posts: 299
sparkly wrote:
KaunganaDoDo wrote:
[quote=Ericsson]Kengen to sell power from Olkaria to South Sudan

http://www.xinhuanet.com...9-07/02/c_138193143.htm[/quote]

More Porojoooo....KenGen has contracted all of its installed Generation Capacity to KPLC...it doesn't have any spare to sell to other Party without Breaking POwer Purchase Agreements with KPLC. Even the oncoming Olkaria V and Olkaria 1 Unit VI is all contracted.

The only entity that can sell power to SSudan in KPLC, since its the owner of the excess contracted Capacity. Just like Kenya Buys power from Uganda...Kplc doesn't buy it from The Generator..UEGCL, it buys from UETCL...Uganda Electricity Transmission Company Limited.



All it takes for Kengen to sell power directly to SS is amendment of one or two sections of the Energy Act.


How? Like What? KenGen is not in the Energy Act, its just another Commercial Company like anyone else.
sparkly
#103 Posted : Wednesday, July 03, 2019 4:22:18 PM
Rank: Elder


Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
KaunganaDoDo wrote:
sparkly wrote:
KaunganaDoDo wrote:
[quote=Ericsson]Kengen to sell power from Olkaria to South Sudan

http://www.xinhuanet.com...9-07/02/c_138193143.htm[/quote]

More Porojoooo....KenGen has contracted all of its installed Generation Capacity to KPLC...it doesn't have any spare to sell to other Party without Breaking POwer Purchase Agreements with KPLC. Even the oncoming Olkaria V and Olkaria 1 Unit VI is all contracted.

The only entity that can sell power to SSudan in KPLC, since its the owner of the excess contracted Capacity. Just like Kenya Buys power from Uganda...Kplc doesn't buy it from The Generator..UEGCL, it buys from UETCL...Uganda Electricity Transmission Company Limited.



All it takes for Kengen to sell power directly to SS is amendment of one or two sections of the Energy Act.


How? Like What? KenGen is not in the Energy Act, its just another Commercial Company like anyone else.


Energy is broadly devided into:
1. Electricity - Generators; Transmitters; Distributors; Regulator and dispute resolution.
2. Petroleum Upstream; Downstream; Regulator and dispute resolution;

All these are set up by Acts of Parliament. Not sure but I think the Act consolidated the Electricty and Petroleum regulators into one.
Life is short. Live passionately.
KaunganaDoDo
#104 Posted : Wednesday, July 03, 2019 5:04:00 PM
Rank: Member


Joined: 8/6/2018
Posts: 299
sparkly wrote:
KaunganaDoDo wrote:
sparkly wrote:
KaunganaDoDo wrote:
[quote=Ericsson]Kengen to sell power from Olkaria to South Sudan

http://www.xinhuanet.com...9-07/02/c_138193143.htm[/quote]

More Porojoooo....KenGen has contracted all of its installed Generation Capacity to KPLC...it doesn't have any spare to sell to other Party without Breaking POwer Purchase Agreements with KPLC. Even the oncoming Olkaria V and Olkaria 1 Unit VI is all contracted.

The only entity that can sell power to SSudan in KPLC, since its the owner of the excess contracted Capacity. Just like Kenya Buys power from Uganda...Kplc doesn't buy it from The Generator..UEGCL, it buys from UETCL...Uganda Electricity Transmission Company Limited.



All it takes for Kengen to sell power directly to SS is amendment of one or two sections of the Energy Act.


How? Like What? KenGen is not in the Energy Act, its just another Commercial Company like anyone else.


Energy is broadly devided into:
1. Electricity - Generators; Transmitters; Distributors; Regulator and dispute resolution.
2. Petroleum Upstream; Downstream; Regulator and dispute resolution;

All these are set up by Acts of Parliament. Not sure but I think the Act consolidated the Electricty and Petroleum regulators into one.


Yap. But Transmission and Distribution Licence doesn't need changes to Energy Act...They are given by ERC...now called EPRA(under new energy Act)... what would be required for them to Transmit/Distribute would be A license and a Review of the Current PPAs....or to Build/Develop a new plant...or a wellhead...Wellheads are the cheaper option... You just go to some of the existing Wellls and you put up a small kaplant called Wellhead...no need to build a power plant.
sparkly
#105 Posted : Wednesday, July 03, 2019 8:42:32 PM
Rank: Elder


Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
KaunganaDoDo wrote:
sparkly wrote:
KaunganaDoDo wrote:
sparkly wrote:
KaunganaDoDo wrote:
[quote=Ericsson]Kengen to sell power from Olkaria to South Sudan

http://www.xinhuanet.com...9-07/02/c_138193143.htm[/quote]

More Porojoooo....KenGen has contracted all of its installed Generation Capacity to KPLC...it doesn't have any spare to sell to other Party without Breaking POwer Purchase Agreements with KPLC. Even the oncoming Olkaria V and Olkaria 1 Unit VI is all contracted.

The only entity that can sell power to SSudan in KPLC, since its the owner of the excess contracted Capacity. Just like Kenya Buys power from Uganda...Kplc doesn't buy it from The Generator..UEGCL, it buys from UETCL...Uganda Electricity Transmission Company Limited.



All it takes for Kengen to sell power directly to SS is amendment of one or two sections of the Energy Act.


How? Like What? KenGen is not in the Energy Act, its just another Commercial Company like anyone else.


Energy is broadly devided into:
1. Electricity - Generators; Transmitters; Distributors; Regulator and dispute resolution.
2. Petroleum Upstream; Downstream; Regulator and dispute resolution;

All these are set up by Acts of Parliament. Not sure but I think the Act consolidated the Electricty and Petroleum regulators into one.


Yap. But Transmission and Distribution Licence doesn't need changes to Energy Act...They are given by ERC...now called EPRA(under new energy Act)... what would be required for them to Transmit/Distribute would be A license and a Review of the Current PPAs....or to Build/Develop a new plant...or a wellhead...Wellheads are the cheaper option... You just go to some of the existing Wellls and you put up a small kaplant called Wellhead...no need to build a power plant.



Part 6 of Energy Act 2019, the following electrical activities need to be licensed;

1. generation;
2. exportation;
3. importation;
4. transmission;
5. distribution;
6. retail supply.

Tariffs set for each of the above activities where one player uses infrastructure of another.

In case of evacuation of power from generation plants to SS, Kenya Power which does mainly does Substation - Customer distribution may not be involved. Power might be evacuated directly by Ketracco from Olkaria then SS to pay for as metered at point of import into SS.
Life is short. Live passionately.
FUNKY
#106 Posted : Thursday, July 04, 2019 10:44:44 AM
Rank: Veteran


Joined: 4/30/2010
Posts: 1,635
https://www.standardmedi...ing-bonds-in-tough-year

KenGen may be among the few firms sailing smoothly as it has managed to pay its Sh25 billion infrastructure bond
VituVingiSana
#107 Posted : Thursday, July 04, 2019 4:14:59 PM
Rank: Chief


Joined: 1/3/2007
Posts: 18,103
Location: Nairobi
FUNKY wrote:
https://www.standardmedia.co.ke/business/article/2001331417/companies-struggle-to-repay-maturing-bonds-in-tough-year

KenGen may be among the few firms sailing smoothly as it has managed to pay its Sh25 billion infrastructure bond
It has been paying it off over many years so what was outstanding this year was minimal.
Greedy when others are fearful. Very fearful when others are greedy - to paraphrase Warren Buffett
sparkly
#108 Posted : Thursday, July 04, 2019 6:38:40 PM
Rank: Elder


Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
VituVingiSana wrote:
FUNKY wrote:
https://www.standardmedia.co.ke/business/article/2001331417/companies-struggle-to-repay-maturing-bonds-in-tough-year

KenGen may be among the few firms sailing smoothly as it has managed to pay its Sh25 billion infrastructure bond
It has been paying it off over many years so what was outstanding this year was minimal.


I am happy Kengen is on the futures market. This will help price discovery.
Life is short. Live passionately.
Ericsson
#109 Posted : Thursday, July 04, 2019 11:06:18 PM
Rank: Elder


Joined: 12/4/2009
Posts: 10,684
Location: NAIROBI
sparkly wrote:
VituVingiSana wrote:
FUNKY wrote:
https://www.standardmedia.co.ke/business/article/2001331417/companies-struggle-to-repay-maturing-bonds-in-tough-year

KenGen may be among the few firms sailing smoothly as it has managed to pay its Sh25 billion infrastructure bond
It has been paying it off over many years so what was outstanding this year was minimal.


I am happy Kengen is on the futures market. This will help price discovery.

Bamburi and kengen left out of the futures market
Wealth is built through a relatively simple equation
Wealth=Income + Investments - Lifestyle
FUNKY
#110 Posted : Thursday, July 04, 2019 11:20:00 PM
Rank: Veteran


Joined: 4/30/2010
Posts: 1,635
Ericsson wrote:
sparkly wrote:
VituVingiSana wrote:
FUNKY wrote:
https://www.standardmedia.co.ke/business/article/2001331417/companies-struggle-to-repay-maturing-bonds-in-tough-year

KenGen may be among the few firms sailing smoothly as it has managed to pay its Sh25 billion infrastructure bond
It has been paying it off over many years so what was outstanding this year was minimal.


I am happy Kengen is on the futures market. This will help price discovery.

Bamburi and kengen left out of the futures market


https://www.businessdail...183446-kc19qu/index.html
Ericsson
#111 Posted : Thursday, July 11, 2019 12:14:37 PM
Rank: Elder


Joined: 12/4/2009
Posts: 10,684
Location: NAIROBI
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)
Wealth is built through a relatively simple equation
Wealth=Income + Investments - Lifestyle
KaunganaDoDo
#112 Posted : Monday, July 15, 2019 7:48:48 AM
Rank: Member


Joined: 8/6/2018
Posts: 299
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay
Ebenyo
#113 Posted : Monday, July 15, 2019 10:31:22 AM
Rank: Veteran


Joined: 4/4/2016
Posts: 1,997
Location: Kitale
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?
Towards the goal of financial freedom
Ericsson
#114 Posted : Monday, July 15, 2019 11:06:54 AM
Rank: Elder


Joined: 12/4/2009
Posts: 10,684
Location: NAIROBI
Ebenyo wrote:
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?


Hakuna
Wealth is built through a relatively simple equation
Wealth=Income + Investments - Lifestyle
KaunganaDoDo
#115 Posted : Monday, July 15, 2019 11:37:15 AM
Rank: Member


Joined: 8/6/2018
Posts: 299
Ebenyo wrote:
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?


NO CHANCE
Ericsson
#116 Posted : Monday, July 15, 2019 12:05:25 PM
Rank: Elder


Joined: 12/4/2009
Posts: 10,684
Location: NAIROBI
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay


Applause Applause Applause
Wealth is built through a relatively simple equation
Wealth=Income + Investments - Lifestyle
Ebenyo
#117 Posted : Monday, July 15, 2019 2:30:39 PM
Rank: Veteran


Joined: 4/4/2016
Posts: 1,997
Location: Kitale
Ericsson wrote:
Ebenyo wrote:
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?


Hakuna



1.National treasury projected a dividend of kshs 0.50 this year.
2.The daily price movement suggests an upward momentum.
3.Jared Othieno has sealed all corruption loopholes.
Towards the goal of financial freedom
Ericsson
#118 Posted : Monday, July 15, 2019 3:02:09 PM
Rank: Elder


Joined: 12/4/2009
Posts: 10,684
Location: NAIROBI
Ebenyo wrote:
Ericsson wrote:
Ebenyo wrote:
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?


Hakuna



1.National treasury projected a dividend of kshs 0.50 this year.
2.The daily price movement suggests an upward momentum.
3.Jared Othieno has sealed all corruption loopholes.


Peleka hii thread to KPLC discussion
Wealth is built through a relatively simple equation
Wealth=Income + Investments - Lifestyle
VituVingiSana
#119 Posted : Monday, July 15, 2019 3:37:32 PM
Rank: Chief


Joined: 1/3/2007
Posts: 18,103
Location: Nairobi
Ebenyo wrote:
Ericsson wrote:
Ebenyo wrote:
KaunganaDoDo wrote:
Ericsson wrote:
KaunganaDoDo wrote:
Ericsson wrote:
sparkly wrote:
Ericsson wrote:
FY comes to an end in Sunday 2359hrs.
Dividend to be retained at 40 cents -
Olkaria V commissioning to be done in FY 2019/2020


Rink?

For dividend that was mentioned during the AGM.
For Olkaria V with the remaining time there is no chance of it coming on board before sunday night.


Synchronization of Olkaria V to the grid is ongoing. Then the Commercial Tests. Testing and commissioning is an ongoing process. By July 1st, as commissioning continue, dispatch to the grid will continue


Effect of the 165MW will most likely be felt in the second half of the current financial year (2019/2020)


Tragedy Struck Olkaria V on Friday during the Prerequisite Commercial Tests when the Steam Gathering Sytem inlet to the plant exploaded, Leaving 2 people in critical conditions...This has effectively pushed Commissioning Dates month in delay





@kaunganadodo sisi watu wa Kplc iku kadividend tutapata in October ukweli?


Hakuna



1.National treasury projected a dividend of kshs 0.50 this year.
2.The daily price movement suggests an upward momentum.
3.Jared Othieno has sealed all corruption loopholes.
d'oh! Laughing out loudly d'oh! Laughing out loudly d'oh! Laughing out loudly
Greedy when others are fearful. Very fearful when others are greedy - to paraphrase Warren Buffett
Angelica _ann
#120 Posted : Monday, July 15, 2019 3:45:08 PM
Rank: Elder


Joined: 12/7/2012
Posts: 11,908
By the way what happened to the Minister, he is nowadays MIA.
In the business world, everyone is paid in two coins - cash and experience. Take the experience first; the cash will come later - H Geneen
Users browsing this topic
Guest (9)
35 Pages«<45678>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.