Wazua
»
Investor
»
Property
»
Low End Housing: High Risk, High Return
Rank: Member Joined: 12/2/2009 Posts: 299 Location: kenya
|
enyands wrote:Chaka wrote:[quote=obiero]Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project Tutalala leo kweli Serious people don't sleep.Wewe endelea Kung'orota.
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Elder Joined: 2/16/2007 Posts: 2,114
|
obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.?
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Elder Joined: 9/23/2009 Posts: 8,083 Location: Enk are Nyirobi
|
obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap Life is short. Live passionately.
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Elder Joined: 12/25/2014 Posts: 2,300 Location: kenya
|
obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city It's in kisii .
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
enyands wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city It's in kisii . Seems the trend is global, USA, South Africa, Kenya.. www.floridarealtors.org/...ts/article.cfm?id=329956www.esor.co.za/low-cost-...projects-are-flying-highwww.nairobibusinessmonth...the-way-to-high-returns/ HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Elder Joined: 9/29/2006 Posts: 2,570
|
obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! The opposite of courage is not cowardice, it's conformity.
|
|
Rank: Member Joined: 9/9/2015 Posts: 233
|
@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have. "Buy when there's blood in the streets, even if the blood is your own."
|
|
Rank: Elder Joined: 9/29/2006 Posts: 2,570
|
The Great wrote:@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have. What I meant is that 5,950/= is not enough to charter whatever aircraft from Nairobi to Kisii. The opposite of courage is not cowardice, it's conformity.
|
|
Rank: Veteran Joined: 4/1/2009 Posts: 1,883
|
jerry wrote:The Great wrote:@jerry if you are wrong admit it and move on. Digging into others to divert attention is not the character of billionaires and you have got to be to have. What I meant is that 5,950/= is not enough to charter whatever aircraft from Nairobi to Kisii. the great is right. you were wrong. just admit it and move on. obiero said it was a chartered flight. he did not say he chartered it.
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
jerry wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! Steps in building a low cost storied building as per own experience.. 1. Draw up architectural and structural plans 2. Develop bills of quantity 3. Seek ministry of health approval at county level 4. Seek physical planning approval at county level 5. Publish change of user notice on property (if needed) 6. Town planner approval 7. Conduct environment impact assesment 8. Present EIA to NEMA for approval 9. Seek NCA certification Anyone with a different scenario?? HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Veteran Joined: 11/15/2013 Posts: 1,977 Location: Here
|
obiero wrote:jerry wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! Steps in building a low cost storied building as per own experience.. 1. Draw up architectural and structural plans 2. Develop bills of quantity 3. Seek ministry of health approval at county level 4. Seek physical planning approval at county level 5. Publish change of user notice on property (if needed) 6. Town planner approval 7. Conduct environment impact assesment 8. Present EIA to NEMA for approval 9. Seek NCA certification Anyone with a different scenario?? Soil the hands of Nos 3-9 Everybody STEALS, a THIEF is one who's CAUGHT stealing something of LITTLE VALUE. !!!
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
Boris Boyka wrote:obiero wrote:jerry wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! Steps in building a low cost storied building as per own experience.. 1. Draw up architectural and structural plans 2. Develop bills of quantity 3. Seek ministry of health approval at county level 4. Seek physical planning approval at county level 5. Publish change of user notice on property (if needed) 6. Town planner approval 7. Conduct environment impact assesment 8. Present EIA to NEMA for approval 9. Seek NCA certification Anyone with a different scenario?? Soil the hands of Nos 3-9 Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Member Joined: 1/20/2015 Posts: 489 Location: Nairobi
|
obiero wrote:Boris Boyka wrote:obiero wrote:jerry wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! Steps in building a low cost storied building as per own experience.. 1. Draw up architectural and structural plans 2. Develop bills of quantity 3. Seek ministry of health approval at county level 4. Seek physical planning approval at county level 5. Publish change of user notice on property (if needed) 6. Town planner approval 7. Conduct environment impact assesment 8. Present EIA to NEMA for approval 9. Seek NCA certification Anyone with a different scenario?? Soil the hands of Nos 3-9 Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages Boss, after you told us there is a 5k charter flight to a rural establishment in the land of night runners, i have been searching for the entire week, where i can charter a plane to eldoret and back for even 10 times that price..........weka mbisha hapa ndio tuamini ulipanda ndege Enjoy every moment of your life, you never know when your time will come.
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
UpcomingPaperChaser wrote:obiero wrote:Boris Boyka wrote:obiero wrote:jerry wrote:obiero wrote:sparkly wrote:obiero wrote:Chaka wrote:obiero wrote:Chaka wrote:obiero wrote:Just landed at Suneka airstrip.. headed to site. finally the damn county accepted to receive the drawings, but are yet to stamp the same. decided to excavate, meanwhile.. Since the architect mentioned that doesnt need approval, and the worst that can happen is to be asked to increase sq m per unit and not outright cancellation of the project @obiero,I wish to know if there are scheduled flights to Suneka?Or you own an aircraft? lol.. no, I do not own an aicraft yet, was a twin engine turbo prop chartered from Wilson. Costs only KES 5,950 one way incl tax Ok,would you mind giving me the contacts of that charter Co.? 020-6006313 Yellow Wings Charter ya elfu sita? lol even a cab wouldn't be that cheap lol.. so next time I ask them to increase ticket price ama namna gani?? its a 19 seater.. hawa watu wa wazua ni wa maajabu.. suneka mwajua ni wapi?? anywho, returned safely to the big bad city If it's a 19 saeter it's not 'chartering". Ni matatu ya hewani! Steps in building a low cost storied building as per own experience.. 1. Draw up architectural and structural plans 2. Develop bills of quantity 3. Seek ministry of health approval at county level 4. Seek physical planning approval at county level 5. Publish change of user notice on property (if needed) 6. Town planner approval 7. Conduct environment impact assesment 8. Present EIA to NEMA for approval 9. Seek NCA certification Anyone with a different scenario?? Soil the hands of Nos 3-9 Sadly. The physical planner asked for 2k. That was the only hitch. Even recorded the convo. Promised myself that I would not use more than 5k total as 'facilitation' fee across all stages Boss, after you told us there is a 5k charter flight to a rural establishment in the land of night runners, i have been searching for the entire week, where i can charter a plane to eldoret and back for even 10 times that price..........weka mbisha hapa ndio tuamini ulipanda ndege Haha. Hi ndege imewasha watu HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Rank: Member Joined: 8/17/2007 Posts: 294
|
has the construction started?
|
|
Rank: Elder Joined: 7/28/2015 Posts: 9,562 Location: Rodi Kopany, Homa Bay
|
instinct wrote:has the construction started?
#cytonn
|
|
Rank: Elder Joined: 6/23/2009 Posts: 13,497 Location: nairobi
|
hardwood wrote:instinct wrote:has the construction started?
#cytonn Not yet. Only excavation.. Going up to 5metre deep in some sections. But I have received all approvals including PP2 for change of user. Construction should start in 2 weeks HF 30,000 ABP 3.49; KQ 414,100 ABP 7.92; MTN 23,800 ABP 6.45
|
|
Wazua
»
Investor
»
Property
»
Low End Housing: High Risk, High Return
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|