Stealth wrote:That eastern bypass was designed by some goat/sheep. it's no longer useful, in the evening the jam stretches for km and u can rarely do 10km/h unless overlapping.
the government shud start thinking of making it dual carriage.
Na malenge wengine ni wale wanatengeneza barabarani ya kuingia thika town. How can a stretch of 1km take the contractor more than 3 months na bado ndio anapanga hardcore?
The road, which is actually class D, was designed in the 1970's and should have been built then. We all know what happened. We Kibaki came in, there was not even time for a re-design. A road had to be delivered pronto. You remember the Kangundo road mess and it's spill-over to Jogoo and Outer ring roads.
Let's be a little grateful for what we have. If we did not have this road, people in Eastlands would be shooting each other in traffic jams today. KENHA should however think of making the road dual urgently.