Kengen HY 2015 results PAT up 400%
sparkly
#131 Posted : Sunday, October 11, 2015 12:05:58 AM
Rank: Elder

Joined: 9/23/2009
Posts: 8,083
Location: Enk are Nyirobi
VituVingiSana wrote:
kawi254 wrote:
Tanzania's switch off of hydro power is to allow gas power plants to be connected to the grid (350 MW). Lindi/Mtwara gas has been piped to Dar(Ubungo) and the gas plants have been coming on step by step. Oct 20th all gas power plants will be fired up. The crisis is almost over and TZ will have stable power thanks to gas discovery in Lindi/Mtwara

No interconnection of note between TZ & KE grids so Kenya Power cannot supply power to TZ.

The article said there's little water in the dams.

maybe he knows something we don't.
Life is short. Live passionately.
MaichBlack
#132 Posted : Sunday, October 11, 2015 12:50:48 PM
Rank: Elder

Joined: 7/22/2009
Posts: 7,839
kawi254 wrote:
Tanzania's switch off of hydro power is to allow gas power plants to be connected to the grid (350 MW). Lindi/Mtwara gas has been piped to Dar(Ubungo) and the gas plants have been coming on step by step. Oct 20th all gas power plants will be fired up. The crisis is almost over and TZ will have stable power thanks to gas discovery in Lindi/Mtwara

No interconnection of note between TZ & KE grids so Kenya Power cannot supply power to TZ.

350MW vs a demand of 870MW. Do the maths!!!
Never count on making a good sale. Have the purchase price be so attractive that even a mediocre sale gives good returns.
14 Pages«<121314
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2026 Wazua.co.ke. All Rights Reserved.