the sage wrote:@a4architect, if there is a flat whose foundation and dound floor have already been built, is it expensive to put up additional flats.
The cost of labour will go slightly higher since materials will have to be transported vertically up the 1st floor and thus take a longer time.
As Iron Sharpens Iron, So one Man Sharpens Another.