Outering Road Finally....
kyt
#41 Posted : Saturday, October 11, 2014 2:09:28 AM
Rank: Elder


Joined: 11/7/2007
Posts: 2,182
dunkang wrote:
Outer Ring Road is 13KM long. Its costing Kenyans 7.45B/- i.e. about 573M/- per kilometer.

Thika "Super" highway is almost 50KM, it costed Kenyans about 27B/- i.e. 540M/- per Kilometer.

So, in short we are saying, the Outer Ring Road may be built like the "Super" Highway. THAT IS GOOD NEWS.

However, the GoK/NCC have completely forgotten many link roads in the Eastern and Northern parts of the City. The links will also assist greatly in increasing efficiency in Transport within the Estates. And each of them is less than 3 KM. Examples;

1. The road connecting Eastern By-Pass to Kayole Spine Road is very vital for Kayole Soweto, Baraka and Njiru etc.

2. The link between Kamiti Road to Thika Superhighway (Base Road) in Zimmerman

3. The link between Githurai 44 to Githurai 45 join again Kamiti Road to Thika Superhighway

4. The road linking Outer ring road to Mathare North Road through Mathare North (eventually completing the Kasarani-Baba Dogo-Mathare North-Huruma-Juja Road)

yoy have brought a very sober point dukang, these money is too much for 13km road. I think iko kitu mbaya inaendelea hapa.
LOVE WHAT YOU DO, DO WHAT YOU LOVE.
maka
#42 Posted : Saturday, October 11, 2014 11:35:02 AM
Rank: Elder


Joined: 4/22/2010
Posts: 11,522
Location: Nairobi
kyt wrote:
dunkang wrote:
Outer Ring Road is 13KM long. Its costing Kenyans 7.45B/- i.e. about 573M/- per kilometer.

Thika "Super" highway is almost 50KM, it costed Kenyans about 27B/- i.e. 540M/- per Kilometer.

So, in short we are saying, the Outer Ring Road may be built like the "Super" Highway. THAT IS GOOD NEWS.

However, the GoK/NCC have completely forgotten many link roads in the Eastern and Northern parts of the City. The links will also assist greatly in increasing efficiency in Transport within the Estates. And each of them is less than 3 KM. Examples;

1. The road connecting Eastern By-Pass to Kayole Spine Road is very vital for Kayole Soweto, Baraka and Njiru etc.

2. The link between Kamiti Road to Thika Superhighway (Base Road) in Zimmerman

3. The link between Githurai 44 to Githurai 45 join again Kamiti Road to Thika Superhighway

4. The road linking Outer ring road to Mathare North Road through Mathare North (eventually completing the Kasarani-Baba Dogo-Mathare North-Huruma-Juja Road)

yoy have brought a very sober point dukang, these money is too much for 13km road. I think iko kitu mbaya inaendelea hapa.


They should explain this...
possunt quia posse videntur
Um Sayala
#43 Posted : Saturday, October 11, 2014 10:43:10 PM
Rank: Veteran


Joined: 12/17/2010
Posts: 1,163
Location: Sudan
pesa mashinani....
"Peace is our profession, War is our business" ...Unknown
Am
#44 Posted : Monday, October 13, 2014 8:26:53 AM
Rank: Veteran


Joined: 2/21/2012
Posts: 1,739
..And anyone aware which Roads they are building in the First Phase (2000KM?) that Gava has been talking about Lately?
Do not be anxious about anything, but in everything, by prayer and petition, with thanksgiving, present your requests to God..
Swenani
#45 Posted : Monday, October 13, 2014 9:27:22 AM
Rank: User


Joined: 8/15/2013
Posts: 13,236
Location: Vacuum
Am wrote:
..And anyone aware which Roads they are building in the First Phase (2000KM?) that Gava has been talking about Lately?


Here
If Obiero did it, Who Am I?
webish
#46 Posted : Monday, October 13, 2014 9:53:25 AM
Rank: Member


Joined: 10/19/2009
Posts: 671
Location: Nairobi
Swenani wrote:
Am wrote:
..And anyone aware which Roads they are building in the First Phase (2000KM?) that Gava has been talking about Lately?


Here


Interesting. Specifically THIS document..


Life is joy, death is peace, but the transition is very difficult.
webish
#47 Posted : Monday, October 13, 2014 9:59:19 AM
Rank: Member


Joined: 10/19/2009
Posts: 671
Location: Nairobi
"Annuity financing program"

I may have missed it on an earlier discussion, but what does this mean? How does it work?

Life is joy, death is peace, but the transition is very difficult.
Am
#48 Posted : Monday, October 13, 2014 10:14:21 AM
Rank: Veteran


Joined: 2/21/2012
Posts: 1,739
Swenani wrote:
Am wrote:
..And anyone aware which Roads they are building in the First Phase (2000KM?) that Gava has been talking about Lately?


Here


Thanks. Seems most of the roads are being built mashinani.
Do not be anxious about anything, but in everything, by prayer and petition, with thanksgiving, present your requests to God..
Bachuma Gate
#49 Posted : Tuesday, November 04, 2014 11:38:18 AM
Rank: Member


Joined: 3/26/2012
Posts: 280
Finally the contractor is mobilizing. One of the site is in the EA aviation grounds between Fedha junction and Nyayo Highrise. Tippers and other machinery were moving to the site over the weekend. Tenants are moving out of properties that are along the road fearing demolition.
DOH
Toxicity
#50 Posted : Tuesday, November 04, 2014 12:48:51 PM
Rank: Member


Joined: 1/15/2010
Posts: 458
Bachuma Gate wrote:
Finally the contractor is mobilizing. One of the site is in the EA aviation grounds between Fedha junction and Nyayo Highrise. Tippers and other machinery were moving to the site over the weekend. Tenants are moving out of properties that are along the road fearing demolition.

Applause Applause Applause Applause
update president set president = speaker where president is null
Angelica _ann
#51 Posted : Tuesday, November 04, 2014 1:01:01 PM
Rank: Elder


Joined: 12/7/2012
Posts: 11,908
Toxicity wrote:
Bachuma Gate wrote:
Finally the contractor is mobilizing. One of the site is in the EA aviation grounds between Fedha junction and Nyayo Highrise(Embakasi). Tippers and other machinery were moving to the site over the weekend. Tenants are moving out of properties that are along the road fearing demolition.

Applause Applause Applause Applause


Great that road is currently pathetic!
In the business world, everyone is paid in two coins - cash and experience. Take the experience first; the cash will come later - H Geneen
Robinhood
#52 Posted : Tuesday, November 04, 2014 3:13:37 PM
Rank: Elder


Joined: 12/11/2008
Posts: 2,306
Bachuma Gate wrote:
Finally the contractor is mobilizing. One of the site is in the EA aviation grounds between Fedha junction and Nyayo Highrise. Tippers and other machinery were moving to the site over the weekend. Tenants are moving out of properties that are along the road fearing demolition.


Where exactly are guys moving out? Most of what I see is business as usual
Great men are not always wise, neither do the aged understand judgement...
willin2learn
#53 Posted : Tuesday, November 04, 2014 6:39:10 PM
Rank: Veteran


Joined: 2/12/2008
Posts: 1,178
Robinhood wrote:
Bachuma Gate wrote:
Finally the contractor is mobilizing. One of the site is in the EA aviation grounds between Fedha junction and Nyayo Highrise. Tippers and other machinery were moving to the site over the weekend. Tenants are moving out of properties that are along the road fearing demolition.


Where exactly are guys moving out? Most of what I see is business as usual



Aweke pikshas
Tall Order
#54 Posted : Wednesday, November 05, 2014 9:32:57 AM
Rank: Member


Joined: 5/9/2014
Posts: 130
Location: Nairobi
It has all been talk on this road since mid this year and nothing concrete has been seen on the ground in regards to any sort of work beginning. The Kenyan way of doings things I suppose.

Kihara joni
#55 Posted : Monday, November 24, 2014 12:41:32 PM
Rank: Member


Joined: 5/8/2013
Posts: 386
Location: Nyali mombasa
On my way to the airport and can confirm work on your 540 million per kilometer road is about or has began seen some shina humans all along the road with those surveying things that look like cameras
Bachuma Gate
#56 Posted : Monday, November 24, 2014 3:54:47 PM
Rank: Member


Joined: 3/26/2012
Posts: 280
kihara the camp is at aviation. fellas still dont believe us until we put pictures. unfortunately i dont have a camera. bure kabisa hao.
DOH
YoungMulla
#57 Posted : Monday, November 24, 2014 4:03:42 PM
Rank: Member


Joined: 3/14/2012
Posts: 577
Location: Nairobi Kenya
I have also see the shinamen, hope no more court cases come up.
Before I die - i will touch the sky!!
majimaji
#58 Posted : Monday, November 24, 2014 4:09:43 PM
Rank: Veteran


Joined: 4/4/2007
Posts: 1,162
YoungMulla wrote:
I have also see the shinamen, hope no more court cases come up.


The shinamen are not there for nyama shoma?d'oh!
innovator
#59 Posted : Monday, November 24, 2014 4:12:37 PM
Rank: Member


Joined: 7/24/2010
Posts: 236
Location: nairobi
Taj mall na ndugu zake sikibomelewa tutakubali, ama hio barabara inajengwa wapi.
Gordon Gekko
#60 Posted : Monday, November 24, 2014 7:23:28 PM
Rank: Elder


Joined: 5/27/2008
Posts: 3,760
innovator wrote:
Taj mall na ndugu zake sikibomelewa tutakubali, ama hio barabara inajengwa wapi.

There's a railway line between Taj and the road. The line isn't being touched therefore Taj will not be touched smile
Users browsing this topic
Guest (3)
9 Pages<12345>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2024 Wazua.co.ke. All Rights Reserved.