I thought it was mandatory that all buildings have a Structural Engineer's drawing which gives details regarding the chumas, foundation, slabs, columns, load bearing, balconies, staircases, roof etc etc, before they are approved. The structural drawing also guides fundis on the quality, quantity, sizes etc of the various materials to be used at each stage.