Wazua
»
Investor
»
Property
»
Question for a4architect
Rank: Veteran Joined: 1/4/2010 Posts: 1,668 Location: nairobi
|
or maybe you can construct using materials of a clas between low cost and middle cost and balance between the low cost materilas vs your space needs then see how far this will take you in between a possible 1 bedroomed vs a possible 2 bedroomed. As Iron Sharpens Iron, So one Man Sharpens Another.
|
|
|
Rank: Veteran Joined: 5/11/2010 Posts: 918
|
Thanks @a4architect. To say you can build a regular (well, maybe not so regular) 1-bd that will somehow morph over time into a 3bd maisonette? If that is the correct understanding then it does sound like a good strategy. Just can't imagine it in my head though. But then again, isn't that why I was asking? Learn first to treat your time as you would your money, then treat your money as you do your time.
|
|
|
Rank: Veteran Joined: 5/11/2010 Posts: 918
|
a4architect.com wrote:or maybe you can construct using materials of a clas between low cost and middle cost and balance between the low cost materilas vs your space needs then see how far this will take you in between a possible 1 bedroomed vs a possible 2 bedroomed. No. I think all factors considered, I'd rather a classier 1bd than a less-classy 2bd. Learn first to treat your time as you would your money, then treat your money as you do your time.
|
|
|
Rank: Veteran Joined: 1/4/2010 Posts: 1,668 Location: nairobi
|
@Seppuku..the wearer of the shoe knows best where it pinches most.The space you need depends on the number of people you propose to house, your aesthetic preferences and your budget. As Iron Sharpens Iron, So one Man Sharpens Another.
|
|
|
Rank: Veteran Joined: 5/11/2010 Posts: 918
|
a4architect.com wrote:@Seppuku..the wearer of the shoe knows best where it pinches most.The space you need depends on the number of people you propose to house, your aesthetic preferences and your budget. And there you heard it from the wearer's mouth! About the morphing... see my other post... is my understanding correct? Learn first to treat your time as you would your money, then treat your money as you do your time.
|
|
|
Rank: Veteran Joined: 1/4/2010 Posts: 1,668 Location: nairobi
|
Ok. a classier 1 bedroomed is fine for you. If i was the one making the choise, i would have chosen a less classy 2 bedroomed since finishes can always be slowly upgraded over time eg floor tiles, fancy wall paint, new roof cover, new kitchen cabinets plus wardrobes, fancy taps etc etc As Iron Sharpens Iron, So one Man Sharpens Another.
|
|
|
Rank: Veteran Joined: 5/11/2010 Posts: 918
|
a4architect.com wrote:Ok. a classier 1 bedroomed is fine for you. If i was the one making the choise, i would have chosen a less classy 2 bedroomed since finishes can always be slowly upgraded over time eg floor tiles, fancy wall paint, new roof cover, new kitchen cabinets plus wardrobes, fancy taps etc etc But doesn't this mean buying (and putting up) the same things twice? That would be expensive in the long run, wouldn't it? Learn first to treat your time as you would your money, then treat your money as you do your time.
|
|
|
Rank: Member Joined: 5/13/2008 Posts: 51
|
@all, thanks for the contributions that have made this a reference thread in matters construction. I have a query about phased construction in another sense.
I am considering a project for a 5 floor flat, approx 210sqm per floor. What I am thinking is: - Construct the entire structure as a shell/frame first i.e foundation, columns, slabs and probably roof. - Do the masonry next, filling in the walls from the ground floor up. - Put in the windows, doors, stair & balcony guard rails etc - Progress to finishing of individual units. - External works etc
My reasoning is that I'd have finished with mambo za chuma, kokoto na koroga kwanza, and also probably save a bit buying the materials in bulk. Secondly would then pace the stages depending on availability of funds. Third would be able to finish up individual units or floors without too much interference with existing tenants, as opposed to say finishing 2 floors completely and then later adding the rest.
Now my queries are: 1. Are there any drawbacks to this kind of plan i.e by not following the usual construction sequence ? 2. Is there a guideline on what %age of cost can be attributed to each stage as outlined above ? Had noted @a4architect's breakdown of foundation, ring beam/columns, walling & roofing being 50% to 60 % of total cost, not sure if this applies to flats as well. If so then would be glad to know what %age can be attributed to walling alone.
Input appreciated.
|
|
|
Rank: Veteran Joined: 1/4/2010 Posts: 1,668 Location: nairobi
|
@ssepuku...it means some finishes will be omitted eg floor tiles, wardrobes, ceiling etc etc @capri 1. its more prudent when all your money spent goes to work for you in terms of rent. Constructing the shell then finishing it up will nean you are parking several million without any return as opposed to completing one floor then receiving rent as you wait for more money. 2. the frame will be approx. 50%. Walling will be 10%. Windows, doors, railings will be 10% and finishes will be 30% approximately. A QS will be more accurate on this. As Iron Sharpens Iron, So one Man Sharpens Another.
|
|
|
Rank: Member Joined: 5/13/2008 Posts: 51
|
@a4architect Fully agree with the reasoning behind starting to get returns on the investment, my main worry was getting complacent after doing 2 or 3 complete floors; restarting construction after having stopped completely would then be a little daunting, esp if cost of materials will then have risen.
Many thanks for the %age split and will of course get a BQ. This gives me an idea of how far I can take the project with an initial lumpsum, then probably consider getting a loan to complete…
|
|
|
Wazua
»
Investor
»
Property
»
Question for a4architect
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|