If you do a bridge across the LIkoni channel, how will ships access the kilindini harbour?


See post no. 11 above.
smile



What is a suspension bridge GATE?


This is a special purpose bridge suspended over a large mass of water and with an electrically actuated hydraulic gate; an operator through some levers actuates the gate to open hence allowing a big Ship/Steamer to pass through the gate while the traffic is stopped at either side of the highway.
smile


I think you have described a drawbridge. A drawbridge has a small span of which Likoni Channel isn't appropriate. A suspension bridge for Likoni will need to be high enough to let ships under it, for which one requires a long 'runway' to ensure a gradual climb/descent. Mombasa Island doesn't have the luxury of real estate to allow for this. The most logical option would be a tunnel. This is very expensive so we just have to put up with the ferries.



Very correct... The approaches on either side of the bridge would be awesome. The execution logistics would not be a stroll in the park, not to mention the financial implications involved.Therein lies the reason why the GK has not acted on the bridge option. It's all very easy reading stuff about what "others" have done elsewhere but its a different ball game trying to replicate the same across the likoni channel.

An engineer friend of mine tells me that he has never come across the phrase "suspension bridge gate".
IF YOU EXPECT ME TO POST ANYTHING POSITIVE ABOUT ASENO, YOU MAY AS WELL SIT ON A PIN
Impunity
#32 Posted : Saturday, January 26, 2013 4:07:18 PM
Rank: Elder

Joined: 3/2/2009
Posts: 26,331
Location: Masada
mwenza wrote:
Gordon Gekko wrote:
Impunity wrote:
mwenza wrote:
Impunity wrote:
mwenza wrote:
If you do a bridge across the LIkoni channel, how will ships access the kilindini harbour?


See post no. 11 above.
smile



What is a suspension bridge GATE?


This is a special purpose bridge suspended over a large mass of water and with an electrically actuated hydraulic gate; an operator through some levers actuates the gate to open hence allowing a big Ship/Steamer to pass through the gate while the traffic is stopped at either side of the highway.
smile


I think you have described a drawbridge. A drawbridge has a small span of which Likoni Channel isn't appropriate. A suspension bridge for Likoni will need to be high enough to let ships under it, for which one requires a long 'runway' to ensure a gradual climb/descent. Mombasa Island doesn't have the luxury of real estate to allow for this. The most logical option would be a tunnel. This is very expensive so we just have to put up with the ferries.



Very correct... The approaches on either side of the bridge would be awesome. The execution logistics would not be a stroll in the park, not to mention the financial implications involved.Therein lies the reason why the GK has not acted on the bridge option. It's all very easy reading stuff about what "others" have done elsewhere but its a different ball game trying to replicate the same across the likoni channel.

An engineer friend of mine tells me that he has never come across the phrase "suspension bridge gate".


Give him a break, he may be a Punjab graduate.

What was the cost of the two new ferries bought recentry? Could that money be enough to build that expensive bridge over the channel?
d'oh!
Portfolio: Sold
You know you've made it when you get a parking space for your yatcht.

mwenza
#33 Posted : Saturday, January 26, 2013 4:29:05 PM
Rank: Elder

Joined: 4/22/2009
Posts: 2,863
Somebody here doesn't seem to appreciate the challenges and the intricasies of doing a suspension bridge across the likoni channel. Trust me if ships do not use that channel, the bridge would have been done a long time ago. It's not like nobody has ever heard of vertical, bascule, suspension bridges etc.... The challenges here are very unique.

People should not confuse this channel with the one that connects MOkowe to Amu island. The only reason the Gk has not done the MOkowe-Amu bridge is political (read loss of livelihood to boat owners/employees).
IF YOU EXPECT ME TO POST ANYTHING POSITIVE ABOUT ASENO, YOU MAY AS WELL SIT ON A PIN
newfarer
#34 Posted : Saturday, January 26, 2013 6:57:15 PM
Rank: Elder

Joined: 3/19/2010
Posts: 3,505
Location: Uganda
Impunity wrote:
What is the fate of the driver?
Its high time we did away with these archaic means of crossing channels.
We need suspension bridges, you done here ferries carrying people in Los Angeles or Hudson Bay!


pole to the affected
punda amecheka
essyk
#35 Posted : Saturday, January 26, 2013 7:20:25 PM
Rank: Elder

Joined: 11/15/2011
Posts: 4,518
Driver is helping police with investigation.
Eye witness says, he tried to save the truck instead of lives.

The brakes failed long before the descend started and he went crushing into the crowd.Pray scary.
'Kata corner', screamed the turn boy but hakusikia.

So no action will be taken wananchi have been asked to obey the ferry rules and yeah it's back to normal till the next tragedy.
God comfort the bereaved.

"The true measure of a man is how he treats someone who can do him absolutely no good.
mgeman
#36 Posted : Saturday, January 26, 2013 7:52:02 PM
Rank: Member

Joined: 11/5/2010
Posts: 131
Location: kenya
Gordon Gekko wrote:
Impunity wrote:
mwenza wrote:
Impunity wrote:
mwenza wrote:
If you do a bridge across the LIkoni channel, how will ships access the kilindini harbour?


See post no. 11 above.
smile



What is a suspension bridge GATE?


This is a special purpose bridge suspended over a large mass of water and with an electrically actuated hydraulic gate; an operator through some levers actuates the gate to open hence allowing a big Ship/Steamer to pass through the gate while the traffic is stopped at either side of the highway.
smile


I think you have described a drawbridge. A drawbridge has a small span of which Likoni Channel isn't appropriate. A suspension bridge for Likoni will need to be high enough to let ships under it, for which one requires a long 'runway' to ensure a gradual climb/descent. Mombasa Island doesn't have the luxury of real estate to allow for this. The most logical option would be a tunnel. This is very expensive so we just have to put up with the ferries.

Anything is possible wazuans the suspension bridge below in china is 355m above the ground. If that is not enough, it is connecting two channels. The chinese are doing crazy bridges, we just have to talk nicely to the Wuyi's.
I am an African

-Thambo Mbeki Speech
harrydre
#37 Posted : Saturday, January 26, 2013 10:01:19 PM
Rank: Elder

Joined: 7/10/2008
Posts: 9,131
Location: Kanjo
we've always had these likoni ferry accidents but never from them.

it's time a bridge was built and heavy lorries restricted from passenger areas and not only Likoni but the entire country.
i.am.back!!!!
dunkang
#38 Posted : Tuesday, August 11, 2015 3:08:59 PM
Rank: Elder

Joined: 6/2/2011
Posts: 4,824
Location: -1.2107, 36.8831
Finally, the solution to the Likoni Crossing is here with us
Receive with simplicity everything that happens to you.” ― Rashi

T-Bag
#39 Posted : Monday, September 30, 2019 3:54:26 PM
Rank: Member

Joined: 9/25/2008
Posts: 510
THIS IS 2019!



Mombasa-Likoni bridge, building will start next april.

The works, costing 82 billion kenian shillings (about 700 million euros), are likely to start in April 2018.

http://www.malindikenya....l-start-next-april.html

SURELY WE CAN’T BE HELPED!!!!

My thoughts coming from sunken car tragedy..is...no one has found how to "eat from this project as usual"...thus delivering the bridge anyways?
I AM trust in GOD, I AM belief in THYSELF
murchr
#40 Posted : Monday, September 30, 2019 4:36:15 PM
Rank: Elder

Joined: 2/26/2012
Posts: 15,980
T-Bag wrote:
THIS IS 2019!



Mombasa-Likoni bridge, building will start next april.

The works, costing 82 billion kenian shillings (about 700 million euros), are likely to start in April 2018.

http://www.malindikenya....l-start-next-april.html

SURELY WE CAN’T BE HELPED!!!!

My thoughts coming from sunken car tragedy..is...no one has found how to "eat from this project as usual"...thus delivering the bridge anyways?



There's something in Mwafika's IQ that is not right. I do not think this will be the last accident. Shida iko na ni kubwa.
"There are only two emotions in the market, hope & fear. The problem is you hope when you should fear & fear when you should hope: - Jesse Livermore
.
8 Pages«<23456>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Copyright © 2026 Wazua.co.ke. All Rights Reserved.