Wazua
»
Investor
»
Economy
»
Eastern Bypass Now open
Rank: Veteran Joined: 4/4/2007 Posts: 1,162
|
From Msa rd thro North Airport rd Embakasi, the section thro' the army land is now open.
Proceed past Utawala, Ruai kangundo rd mpaka Thika rd.
Happy motoring!
|
|
Rank: Veteran Joined: 12/8/2009 Posts: 975 Location: Nairobi
|
majimaji wrote: From Msa rd thro North Airport rd Embakasi, the section thro' the army land is now open.
Proceed past Utawala, Ruai kangundo rd mpaka Thika rd.
Happy motoring!
@maji Open? good. Lakini how is the actual road? You will know that you have arrived when money and time are not mutually exclusive "events" in you life!
|
|
Rank: Member Joined: 3/30/2010 Posts: 176
|
@maji, I thought the road is supposed to go through the barrier not through Utawala. I found going through Utawala more of a panya route than a road
|
|
Rank: Veteran Joined: 4/4/2007 Posts: 1,162
|
The tarmac starts near kq's pride centre at the army gate. Forget abt the other panya route though generally the area after the army land behind AP Training sch is also known as utawala.
|
|
Rank: Member Joined: 10/26/2008 Posts: 380
|
For those in the know, Can someone use that bypass to go from Mombasa Road - Safari Park, without having to go all the way to Ruiru?
Suggested routes? Am planning to take a test drive to see the condition or panya routes, but there is probably someone who has done this. Saidia.
The alternative of Msa Road - Outering - Allsops - Thika Road is the shortest (distance wise) but the longest, time wise, especially about 5pm.
|
|
Rank: Member Joined: 7/21/2010 Posts: 249 Location: nairobi
|
now its the time to invest along the by-pass......1/8 plots on offer, 200metres from bypass, 3Km from thika super highway....with clean freehold title deed..... ..desire to succeed is always fighting with fear of failure..
|
|
Rank: Member Joined: 11/18/2009 Posts: 175
|
Mkimwa wrote:For those in the know, Can someone use that bypass to go from Mombasa Road - Safari Park, without having to go all the way to Ruiru?
Suggested routes? Am planning to take a test drive to see the condition or panya routes, but there is probably someone who has done this. Saidia.
The alternative of Msa Road - Outering - Allsops - Thika Road is the shortest (distance wise) but the longest, time wise, especially about 5pm. @ Mkiwa another possibility is use bypass upto Ruai from Utawala join kangundo road, branch off at njiru through mwiki kasarani then safaripark Some you win some you lose
|
|
Rank: New-farer Joined: 7/22/2010 Posts: 15 Location: Nairobi
|
@Maina20 Price? Do things simply; Even better, Do simple things
|
|
Rank: New-farer Joined: 7/19/2010 Posts: 98 Location: Kenya
|
Maji maji . From Kq gate do you driving continuosly on tarmac upto Kangudo Road ?
|
|
Rank: Veteran Joined: 4/4/2007 Posts: 1,162
|
@whynow, yes. Its tarmac all the way just after pride cnt. The tarmac starts at the army barracks gate all the way to kangundo and thika rd. But diversions will be at bridges and kangundo rd fly-over.
|
|
Rank: Elder Joined: 10/13/2009 Posts: 1,950 Location: in kenya
|
I hope these bypasses will not be like the new kagio-karatina-nyeri road.Its chipping off even before its even marked. '......to the acknowledgment of the mystery of God, and of the Father, and of Christ; 3 In whom are hid all the treasures of wisdom and knowledge.' Colossians 2:2-3
|
|
Rank: Member Joined: 4/1/2008 Posts: 141
|
how far is githunguri plots?from bypass anyone know?
|
|
Rank: Member Joined: 11/18/2009 Posts: 175
|
wanyina wrote:how far is githunguri plots?from bypass anyone know? if you are talking about the land subdivide by githunguri (Mpig) that you have to get to ruiru town the drive another 2-3km toward kwamaiko. from where thw Bypass joins thika road its a approx 5minutes drive Some you win some you lose
|
|
Rank: Member Joined: 1/10/2008 Posts: 365
|
have you guys noticed that the construction of the overpass at mombasa road halted?
and that the overpass itself is so low that trucks with high cargo often scratch the overpass ( or the overpass scratches the trucks), infact at one time i saw some brand new cars from mombasa loaded on two stacks on a trailer that were unable to pass.
According to the initial plan, those two buildings (ramtons and the one next) shouldn't be there . The ramtons building is still in use, although the other one is disused
|
|
Rank: New-farer Joined: 8/7/2012 Posts: 39
|
I think I heard something like some of the owners of the buildings that were to be demolished went to court and that's why the project was halted...
|
|
Rank: Veteran Joined: 11/4/2008 Posts: 1,289 Location: Nairobi
|
subzero wrote:have you guys noticed that the construction of the overpass at mombasa road halted?
and that the overpass itself is so low that trucks with high cargo often scratch the overpass ( or the overpass scratches the trucks), infact at one time i saw some brand new cars from mombasa loaded on two stacks on a trailer that were unable to pass.
According to the initial plan, those two buildings (ramtons and the one next) shouldn't be there . The ramtons building is still in use, although the other one is disused That overpass connects with the southern bypass if am not wrong.
|
|
Rank: Member Joined: 1/10/2008 Posts: 365
|
FundamentAli wrote: That overpass connects with the southern bypass if am not wrong.
Wrong, that overpass is the junction between the eastern bypass and mombasa road The southern bypass touches mombasa road at ole sereni/likoni road
|
|
Rank: Elder Joined: 3/2/2009 Posts: 26,328 Location: Masada
|
subzero wrote:have you guys noticed that the construction of the overpass at mombasa road halted?
and that the overpass itself is so low that trucks with high cargo often scratch the overpass ( or the overpass scratches the trucks), infact at one time i saw some brand new cars from mombasa loaded on two stacks on a trailer that were unable to pass.
According to the initial plan, those two buildings (ramtons and the one next) shouldn't be there . The ramtons building is still in use, although the other one is disused The overpass is fabricated from steel bars fastened together which I think sould be easy to remove and raise the height, unless the concrete jungle on most overpasses on Thika road. Portfolio: Sold You know you've made it when you get a parking space for your yatcht.
|
|
Rank: New-farer Joined: 6/2/2011 Posts: 42 Location: Kwa Nyumba
|
Kanjora1 wrote:I think I heard something like some of the owners of the buildings that were to be demolished went to court and that's why the project was halted... True. The same story w/ Outering Rd from JKIA-Thika Rd. landlords wamelete shida kubwa sana. Wait until the Uhuru H/way begins and the drama continues... 'Hope' is not a strategy. Take Action!
|
|
Wazua
»
Investor
»
Economy
»
Eastern Bypass Now open
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.
|